Drill Results - 2023

Baselode completed 1,630 metres in eight drill holes (CT23-001 to CT23-008).  Of note, CT23-005 intersected a structurally-controlled quartz-hematite-clay alteration system over 105 m core length that shares numerous similarities with fluid conduits observed near other Athabasca basement-hosted uranium deposits, and CT23-008 intersected a 17 m long pervasive chlorite, clay and decalcification zone akin to numerous basement-hosted Athabasca uranium deposits.