In 2022, a 22,500-metre drill program was completed on the ACKIO high-grade uranium discovery, located in the Athabasca Basin.
Drill Highlights included.
- AK22-009: 0.28% U3O8 over 10.5 m at 107.6 m true vertical depth includes 0.51% U3O8 over 2.0 m
- AK22-011: 0.69% U3O8 over 3.6 m at 144.6 m true vertical depth includes 1.26%
- AK22-032: 0.55% U3O8 over 13.2 m at 136.0 m true vertical depth includes 0.99% U3O8 over 6.3 m
- AK22-047: 1.67% U3O8 over 7.5 m at 99.3 m true vertical depth includes 2.45% U3O8 over 5.0 m
- AK22-068: 0.50% U3O8 over 18.5 m starting at 55.2 m true vertical depth which includes 1.53% U3O8 over 3.5 m
- AK22-069 of 0.90% U3O8 over 31.0 m starting at 69.3 m true vertical depth which includes 1.86% U3O8 over 12.5 m at 79.7 m true vertical depth.
A webinar from James Sykes, CEO of Baselode and Cameron McKay, VP of Exploration detailing interpretations and understandings of assay results from ACKIO can be found here.