The Hook project is hosted within the basement rocks of the Wollaston domain, which hosts the highest grade uranium deposits in the world. This is in line with Baselode’s “Athabasca 2.0” strategy: exploring and developing projects with little to no sandstone cover, in areas that have deep rooted structures with ideal structural “traps” for uranium mineralization.